"railroad diagram"
2016-02-25 16:12
1361 查看
1 down vote accepted | As a "railroad diagram", this has some properties in common with a railroad track. Upon entering the diagram from the left, when arriving at the first switch, there is no option of going left or right. Just like a railroad switch, the diagram switch has two converging tracks, but no way to pass from one of those to the other. The switch on the right hand side however, with traffic arriving from the left, provides the options of following either of the diverging routes, effectively ending or repeating the syntax rule. Thus the diagram defines instances of whitespace to be composed of any positive number of spaces, tabs, line ends, or comments. |
相关文章推荐
- LINK1123:failure during conversion to COFF:file invalid or corrupt
- Ajaxadr ajax跨域请求crossdomain
- mybaits in
- HDOJ Train Problem I
- RevitAPI: 事务的错误或警告信息的处理 - Failure Processor of Transaction .
- 70. Climbing Stairs
- 解决TIME_WAIT过多造成的问题
- sleep() 和 wait() 有什么区别?
- AIDL初探以及学习
- 收到的电邮附件为Winmail.dat?
- move_uploaded_file的failed to open stream错误处理
- move_uploaded_file的failed to open stream错误处理
- 错误提示:process launch failed: Security
- 淘汰人工的机器时代
- 在可以调用 OLE 之前,必须将当前线程设置为单线程单元(STA)模式。请确保您的 Main 函数带有 STAThreadAttr
- linxu 中大量的close_wait 和 time_wait 处理
- 217. Contains Duplicate
- AIX ERRPT日志查询
- RAID5磁盘阵列配置
- Could not obtain transaction-synchronized Session for current thread 异常处理方式