POJ 题目2377 Bad Cowtractors(最大生成树)
2015-01-30 22:21
411 查看
Bad Cowtractors
Description
Bessie has been hired to build a cheap internet network among Farmer John's N (2 <= N <= 1,000) barns that are conveniently numbered 1..N. FJ has already done some surveying, and found M (1 <= M <= 20,000) possible connection routes between pairs of barns.
Each possible connection route has an associated cost C (1 <= C <= 100,000). Farmer John wants to spend the least amount on connecting the network; he doesn't even want to pay Bessie.
Realizing Farmer John will not pay her, Bessie decides to do the worst job possible. She must decide on a set of connections to install so that (i) the total cost of these connections is as large as possible, (ii) all the barns are connected together (so that
it is possible to reach any barn from any other barn via a path of installed connections), and (iii) so that there are no cycles among the connections (which Farmer John would easily be able to detect). Conditions (ii) and (iii) ensure that the final set of
connections will look like a "tree".
Input
* Line 1: Two space-separated integers: N and M
* Lines 2..M+1: Each line contains three space-separated integers A, B, and C that describe a connection route between barns A and B of cost C.
Output
* Line 1: A single integer, containing the price of the most expensive tree connecting all the barns. If it is not possible to connect all the barns, output -1.
Sample Input
Sample Output
Hint
OUTPUT DETAILS:
The most expensive tree has cost 17 + 8 + 10 + 7 = 42. It uses the following connections: 4 to 5, 2 to 5, 2 to 3, and 1 to 3.
Source
USACO 2004 December Silver
ac代码
Time Limit: 1000MS | Memory Limit: 65536K | |
Total Submissions: 10952 | Accepted: 4619 |
Bessie has been hired to build a cheap internet network among Farmer John's N (2 <= N <= 1,000) barns that are conveniently numbered 1..N. FJ has already done some surveying, and found M (1 <= M <= 20,000) possible connection routes between pairs of barns.
Each possible connection route has an associated cost C (1 <= C <= 100,000). Farmer John wants to spend the least amount on connecting the network; he doesn't even want to pay Bessie.
Realizing Farmer John will not pay her, Bessie decides to do the worst job possible. She must decide on a set of connections to install so that (i) the total cost of these connections is as large as possible, (ii) all the barns are connected together (so that
it is possible to reach any barn from any other barn via a path of installed connections), and (iii) so that there are no cycles among the connections (which Farmer John would easily be able to detect). Conditions (ii) and (iii) ensure that the final set of
connections will look like a "tree".
Input
* Line 1: Two space-separated integers: N and M
* Lines 2..M+1: Each line contains three space-separated integers A, B, and C that describe a connection route between barns A and B of cost C.
Output
* Line 1: A single integer, containing the price of the most expensive tree connecting all the barns. If it is not possible to connect all the barns, output -1.
Sample Input
5 8 1 2 3 1 3 7 2 3 10 2 4 4 2 5 8 3 4 6 3 5 2 4 5 17
Sample Output
42
Hint
OUTPUT DETAILS:
The most expensive tree has cost 17 + 8 + 10 + 7 = 42. It uses the following connections: 4 to 5, 2 to 5, 2 to 3, and 1 to 3.
Source
USACO 2004 December Silver
ac代码
#include<stdio.h> #include<string.h> int map[1010][1010],v[1010]; int n,m; void prim() { int i,j,ans=0; memset(v,0,sizeof(v)); v[1]=1; for(i=1;i<n;i++) { int min=-1; int k=-1; for(j=1;j<=n;j++) { if(!v[j]&&map[1][j]>min) { k=j; min=map[1][j]; } } if(k==-1) break; ans+=map[1][k]; v[k]=1; for(j=1;j<=n;j++) { if(!v[j]&&map[1][j]<map[k][j]) map[1][j]=map[k][j]; } } if(i<n) printf("-1\n"); else printf("%d\n",ans); } int main() { //int n,m; while(scanf("%d%d",&n,&m)!=EOF) { int i,j; memset(map,-1,sizeof(map)); for(i=0;i<m;i++) { int a,b,c; scanf("%d%d%d",&a,&b,&c); if(c>map[a][b]) map[a][b]=map[b][a]=c; } prim(); } }
相关文章推荐
- POJ 2377 Bad Cowtractors(kruskal最大生成树)
- POJ 2377 Bad Cowtractors(裸的最大生成树)
- poj - 2377 Bad Cowtractors&&poj 2395 Out of Hay(最大生成树)
- poj 2377 Bad Cowtractors(最大生成树)
- POJ 2377 Bad Cowtractors【最小生成树变形&&最大生成树】
- POJ 2377 Bad Cowtractors(最大生成树--kruskul)
- poj 2377 Bad Cowtractors(最大生成树)
- POJ - 2377 Bad Cowtractors(图论/最大生成树)
- POJ_2377_Bad Cowtractors_最大生成树
- Bad Cowtractors POJ - 2377(最大生成树)
- POJ 2377 Bad Cowtractors【最大生成树】
- POJ 2377 - Bad Cowtractors(最大生成树)
- POJ - 2377 Bad Cowtractors(最大生成树)
- POJ 2377 Bad Cowtractors(最大生成树)
- POJ - 2377 Bad Cowtractors (最大生成树,Kruskal)
- 【POJ】2377 - Bad Cowtractors(最大生成树)
- poj 2377 Bad Cowtractors(最大生成树!)
- POJ-2377--Bad Cowtractors---最大生成树
- poj 2377 Bad Cowtractors(最大生成树)
- POJ 2377 Bad Cowtractors(最大生成树)