项目计划,重点及文档
2007-08-28 23:14
288 查看
五个阶段:
Requirements Definition (需求分析)
System Design and Setup (系统设计)
System Implementation (项目执行)
User Acceptance Test (验收测试)
Training and Documentation (培训及文档)
Requirements Definition (需求分析)
· Confirm on project execution plan (确定项目执行计划)
· Confirm detailed functional specifications (确定性能规格书)
· Develop interface design (用户界面开发)
· Develop test strategy (测试策略开发)
· Confirm database migration strategy (确定数据库迁移策略)
· Confirm Security, ext. System integration and other infrastructure consideration (确定安全,系统集成等事项)
ü Project Execution plan (项目执行计划)
ü Project Plan (项目计划)
ü Detailed functional specifications (性能规格书)
ü System interface design (系统界面规格书))
ü Data and Web Content Conversion Documentation (数据转换文档)
ü System Configuration Documentation (系统配置文档)
ü Cut Over Plan (迁移计划)
System Design and Setup (系统设计)
· Confirm database design and application flow (确定数据库及程序流程)
· Develop deployment plan (部署计划开发)
· Setup server configuration (服务器配置)
· Infrastructure setup (基础配置)
· Confirm office 2007 Template Design/Workflow (确定MOSS2007模板及流程)
ü Detail design specifications (详细设计规格书)
ü System Design Documentation(系统设计文档)
ü Security Documentation (安全文档)
ü Interface Documentation (界面文档)
System Implementation (项目执行)
· Design Core Program / Common Library (核心程序/公共库设计)
· Design XSLT for UI (为用户界面设计XSLT)
· MOSS 2007 Template/Workflow Implementation and configuration
(MOSS2007模板/流程开发和配置)
· Application system Implementation and configuration
(系统开发和配置)
· Unit and system Integration testing
(单体和系统测试)
· Testing Inclusive of external system
(整体环境测试)
· System Integration
(系统集成)
· Content Migration
(内容数据搬迁)
ü Unit and system Integration testing results (单体和系统集成测试结果)
ü User Manual draft (用户手册草稿)
ü Program Documentation (源码文档化)
User Acceptance Test (验收测试)
· Execute test plan (完成测试计划)
· User acceptance test (UAT) (验收测试)
ü Test Script (测试脚本)
ü User Test Signoff (用户测试验收)
ü Finalize User Manual (用户手册完稿)
ü Procedure /Operations Manual (操作指南/手册)
ü Disaster Recovery Documentation (应急文档)
ü Training Plan (培训计划)
Training and Documentation (培训及文档)
· Develop training plan and set training environment (开发培训/培训环境设制)
· Conduct training session (培训课程)
· Prepare manual and technical documentation (准备所有手册/技术文档)
· Data migration and go-live preparation (数据搬迁和准备go-live)
ü Training Plans and materials (培训计划和资料)
ü Manual and technical documentation (所有手册/技术文档)
ü Go-Live checklist and handover documentation (go-live检查清单和文档移交)
Requirements Definition (需求分析)
System Design and Setup (系统设计)
System Implementation (项目执行)
User Acceptance Test (验收测试)
Training and Documentation (培训及文档)
Requirements Definition (需求分析)
· Confirm on project execution plan (确定项目执行计划)
· Confirm detailed functional specifications (确定性能规格书)
· Develop interface design (用户界面开发)
· Develop test strategy (测试策略开发)
· Confirm database migration strategy (确定数据库迁移策略)
· Confirm Security, ext. System integration and other infrastructure consideration (确定安全,系统集成等事项)
ü Project Execution plan (项目执行计划)
ü Project Plan (项目计划)
ü Detailed functional specifications (性能规格书)
ü System interface design (系统界面规格书))
ü Data and Web Content Conversion Documentation (数据转换文档)
ü System Configuration Documentation (系统配置文档)
ü Cut Over Plan (迁移计划)
System Design and Setup (系统设计)
· Confirm database design and application flow (确定数据库及程序流程)
· Develop deployment plan (部署计划开发)
· Setup server configuration (服务器配置)
· Infrastructure setup (基础配置)
· Confirm office 2007 Template Design/Workflow (确定MOSS2007模板及流程)
ü Detail design specifications (详细设计规格书)
ü System Design Documentation(系统设计文档)
ü Security Documentation (安全文档)
ü Interface Documentation (界面文档)
System Implementation (项目执行)
· Design Core Program / Common Library (核心程序/公共库设计)
· Design XSLT for UI (为用户界面设计XSLT)
· MOSS 2007 Template/Workflow Implementation and configuration
(MOSS2007模板/流程开发和配置)
· Application system Implementation and configuration
(系统开发和配置)
· Unit and system Integration testing
(单体和系统测试)
· Testing Inclusive of external system
(整体环境测试)
· System Integration
(系统集成)
· Content Migration
(内容数据搬迁)
ü Unit and system Integration testing results (单体和系统集成测试结果)
ü User Manual draft (用户手册草稿)
ü Program Documentation (源码文档化)
User Acceptance Test (验收测试)
· Execute test plan (完成测试计划)
· User acceptance test (UAT) (验收测试)
ü Test Script (测试脚本)
ü User Test Signoff (用户测试验收)
ü Finalize User Manual (用户手册完稿)
ü Procedure /Operations Manual (操作指南/手册)
ü Disaster Recovery Documentation (应急文档)
ü Training Plan (培训计划)
Training and Documentation (培训及文档)
· Develop training plan and set training environment (开发培训/培训环境设制)
· Conduct training session (培训课程)
· Prepare manual and technical documentation (准备所有手册/技术文档)
· Data migration and go-live preparation (数据搬迁和准备go-live)
ü Training Plans and materials (培训计划和资料)
ü Manual and technical documentation (所有手册/技术文档)
ü Go-Live checklist and handover documentation (go-live检查清单和文档移交)
相关文章推荐
- MOSS项目开发(1)- 项目计划,重点及文档
- MOSS项目开发(1)- 项目计划,重点及文档
- 机房收费系统文档(二)项目开发计划
- 软件开发项目-文档编写标准化--测试计划
- 项目配置管理计划-完整的范例文档
- 软件工程之— 项目开发文档(项目开发计划)
- [文档]02_项目开发计划(省略)
- 项目管理软件-计划/进度/沟通/文档管理、bug追踪、项目协作、强大报表...尽在Zoho Projects
- 软件设计文档国家标准—项目开发计划(GB856T——88)
- 软件开发项目-文档编写标准化--项目开发计划
- 国家重点研发计划高新领域 “智能机器人、网络协同制造和智能工厂”重点专项2018年度项目申报指南建议
- 项目管理文档-【4】IT项目计划阶段
- 软件生存周期文档系列 之 2.项目开发计划
- 【软件工程】机房文档--项目开发计划
- 国标软件设计文档之项目开发计划
- 软件工程之— 项目开发文档(组装测试计划)
- 项目文档设计分类
- 项目管理:计划与跟踪过程
- 基于Spring cloud boot 的基础功能架构项目介绍文档
- 项目详细设计开发文档