XXX项目验货
1开箱验收:1. 1 包装检查
设备未开箱前,先对设备包装进行检查,察看有无破损、水渍等情况,如有,详细记录破损和水渍的部位和程度。
检查结果:完好_____、异常_____。(打”√”或打”×”进行选择)
异常情况说明:
1.2 设备外观检查
设备开箱后,先对设备外观进行检查,设备外壳应平整,表面无污渍、划伤。
检查结果:完好_____、异常_____。(打”√”或打”×”进行选择)
异常情况说明:
2、设备明细清单(摘录合同配置页):
Product | Description | Qty. | 备注 |
汇聚层交换机Catalyst 6506一台 | |||
WS-C6506 | Catalyst 6506 Chassis | 1 | |
WS-CDC-1300W | Catalyst 6000 1300W DC Power Supply | 1 | |
WS-CDC-1300W/2 | Catalyst 6000 Second 1300W DC Power Supply | 1 | |
WS-X6K-S2U-MSFC2 | Cat6K Sup2 with 256MB DRAM on Sup2 and MSFC2 | 1 | |
MEM-C6K-FLC24M | Catalyst 6000 Supervisor PCMCIA Flash Mem Card, 24MB Option | 1 | |
WS-X6148-RJ-45 | Catalyst 6500 48-Port 10/100, Upgradable to Voice, RJ-45 | 1 | |
WS-X6408A-GBIC | Catalyst 6000 8-port GE, Enhanced QoS (Req. GBICs) | 1 | |
WS-G5484 | 1000BASE-SX Short Wavelength GBIC (Multimode only) | 6 | |
汇聚层交换机Catalyst 4506三台 | |||
WS-C4506 | Catalyst 4500 Chassis (6-Slot),fan, no p/s | 3 | |
PWR-C45-1400DC-P | Catalyst 4500 1400W DC Integrated PSU | 3 | |
PWR-C45-1400DC-P/2 | Catalyst 4500 1400W DC Integrated PSU Redundant | 3 | |
WS-X4515 | Catalyst 4000 Supervisor IV (2 GE),Console(RJ-45) | 3 | |
MEM-C4K-FLD64M | Catalyst 4000 Sup III/IV Compact Flash Disk, 64MB Option | 3 | |
WS-X4148-RJ | Catalyst 4000 10/100 Auto Module, 48-Ports (RJ-45) | 3 | |
WS-X4306-GB | Catalyst 4000 Gigabit Ethernet Module, 6-Ports (GBIC) | 3 | |
WS-G5484 | 1000BASE-SX Short Wavelength GBIC (Multimode only) | 12 |
日期:
相关文章推荐
- 项目实施规范------项目开工报告
- 软件开发之我剑!----项目实施和验收,洞房花烛夜。
- 项目管理规范 RUP管理实施中角色的划分
- IT项目实施规范
- 项目实施规范------项目费用计划
- 网站项目实施业务流程及规范
- 项目管理规范-RUP管理实施(一)
- 项目管理规范-RUP管理实施
- 项目实施规范------项目变更备忘录
- 项目实施规范------项目风险评估表
- CDMA 1X WAP2.0业务网 设备实施规范 (V1.0)
- 8步共振项目管理体系(7):项目实施过程的基本规范
- 项目实施计划及总体设计报告(范例)
- 网站项目实施业务流程及规范
- 项目管理规范-RUP管理实施
- 项目管理规范-RUP管理实施(二)
- 项目实施流程和规范模板(测试方向)
- 项目实施规范------项目场地检查表
- 项目实施规范------项目管理计划